Project Description
This residential section in New Plymouth was low lying with very soft ground and was not suitable for building on. Our team excavated and removed unusable soil from site for disposal, supplied and placed geotextile material over the entire section and then over 300m3 of basecourse metal was supplied and delivered to site and spread in preparation for piling and construction.