Project Description
An impressive lifestyle property in the heart of New Plymouth where our team has prepared the site for construction of a new shed and plant shelter platform. The scope of this project included the excavation of topsoil from the 260m long driveway and two plat forms, relocating the topsoil onsite for later use. The team supplied, delivered and placed 170m3 of AP65 metal to all excavated areas, the driveway metal was then graded and rolled while the other platforms were rolled and levelled with the Caterpillar 259D Skidsteer and Sharpe laser leveller, providing the perfect finish for the next step of the project. Check out the progress photos of the project above!